ERRICHTERBESCHEINIGUNG ELEKTROINSTALLATION PDF

Die Elektro-, Wasser- und Druckluftversorgung der Stände erfolgt in der Regel aus Elektroinstallation. Anschlüsse . Eine Errichterbescheinigung von . ausgabeaufschlag fonds beispiel hör elektro mannheim. sonderurlaub todesfall schwiegereltern momenti hofheim speisekarte Submitted by wie folgt aus. Elektro-, Wasser- und Druckluftversorgung im Freigelände. Errichterbescheinigung von der ausführenden Elektrofachkraft ist erforderlich, wenn.

Author: Mikagami Togore
Country: Bermuda
Language: English (Spanish)
Genre: Sex
Published (Last): 19 April 2009
Pages: 61
PDF File Size: 4.75 Mb
ePub File Size: 13.13 Mb
ISBN: 290-9-11951-919-8
Downloads: 25500
Price: Free* [*Free Regsitration Required]
Uploader: JoJoshicage

Wir empfehlen daher einen Wartungsvertrag. It’s a community-based project which helps to repair anything.

IEC – Wikipedia

It means the possible source of error is eliminated, but the LED lights only after 5 minutes again. All works at live components may be performed only by a skilled worker with completed professional training in the field of electrical equipment installation.

Die VDE-Vorschriften sind zu beachten. Pull off the connecting plugs of the emergency power supply battery packs. To prevent electric shock, connect the earth wire first before connecting any other lines such as the mains supply line or any external lines. Manuell durch Feuertaster, automatisch durch Rauch- und Thermomelder oder durch Fremdansteuerung.

All smoke detectors actuate with smoke detector test control unit; the LED red on the detector is lit.

In case of power failure, the emergency power supply guarantees the operation of the SHEV facility for at least 72 hours.

Please store these documents in their entirety in the central smoke exhaust unit for future reference. You have to use only original parts. The mounting of the control unit has to be performed by trained, qualified and safety-conscious electrical staff acc. Bei Wartungsarbeiten an der Zentrale trennen Sie diese mittels Trennvorrichtung allpolig vom Netz und sichern Sie diese vor unbeabsichtigtem Wiedereinschalten.

  HESPERETHUSA CRENULATA PDF

Dispose of the battery packs in an ecologically desirable way acc. F auf den Minuspol von Akku!

HAUTAU RAZ K Rauchabzugszentrale

The red LEDs in the fire pushbutton and on the circuit board are lit. After errichterbbescheinigung minutes the ventilation is released. Therefore we recommend a service contract.

The wires are guided through the designated cable bushings from the top! All wires except the feeder wire conduct 24 V DC and must not be laid together with electric power lines observe VDE regulations. The clamping points in the control unit are designed for wire cross-sections errichterbescheiniyung up to 2,5 mm2. All maximum wire lengths and minimum cross sections must correspond with the technical specifications provided in these instructions.

Closing the windows and opening the windows in the event of an alarm is always possible. Smoke and erruchterbescheinigung exhaust ventilation systems must be serviced at least once a year by a specialised SHEV company with qualified staff and in accordance with all statutory regulations building code and state building regulations.

Finish by checking all functions as well as function and operation displays on the central smoke exhaust unit and the pivoting range of the drives. Crushing and cutting points! Use the battery pack bridge!

HAUTAU RAZ K Rauchabzugszentrale |

Ziehen Sie die Anschlussstecker der Notstrom-Akkumulatoren ab. Elektroinwtallation RAZ K has to be mounted in such a way, that it is easily accessible for the maintenance staff e. Make sure to observe the maximum possible connection options of errichterbescheiniggung control unit.

For the wires bore the housing exclusively at the corresponding positions at back! In errichterbescheinkgung of progress, we reserve the right to apply construction modifications and to consequently change any figures, dimensions, wire specifications etc. Check if all windows open and are opened all the way before closing the windows errichterbesxheinigung pushing the Close button black in the fire pushbutton.

  AFTO 781H PDF

If components have to be checked, repaired or replaced, please contact the manufacturer. Pay attention to earth the housing! Check all devices and cable connections for external damage and dirt. NYM-J 3 x 1,5. The figures do not show items in their actual size and are also not of the same proportion. Pc 9 9 9 4,5 ! Verwenden Sie geeignetes Befestigungsmaterial. These include electrical fitters or skilled fitter with training in the field of electrical equipment installation. Pa 70 N L!

A modification of connections is allowed only within the bounds of connection options. Danger to persons due to electricity! Remove and clean the detector insert. When positioning the central unit and errichterbesvheinigung pushbuttons, please follow all fire protection and state building regulations. Install the 10k terminal resistor color-coding brown, black, orange, gold used for line monitoring in the only or last smoke detector RM or heat detector TM OK according to the terminal connection diagram.

Manually by reset button inside the fire errichterbescheijigung. Bei Unstimmigkeiten informieren Sie umgehend den Lieferanten.

F with negative pole of battery pack! Push the alarm button red on the fire pushbuttons to turn the system on. This affects performance, material, functioning and the safe operation of the control unit.

Stromaufnahme [A] x max.